Monday, May 27, 2013

Portage la Prairie Layout Trackplans

The eight steps of Portage la Prairie layout planning have led us to...the trackplan.  In 1986, CN 9627-5135 led lumber empties west at the UGG/storage track switch. The Cominco Elevator shed, arena, Tupper Street overpass and UGG elevator with grain cars complete the scene. Now what? Seven more steps:
STEP 1 - SIGNATURE SCENES SCHEMATIC
On a blank piece of paper, with the major streets that I'd use in each trackplan (Eighth St NW, Tupper Street overpass and Third Street NE) as benchmarks. I wrote down each signature scene I wanted to include in each trackplan: interchange, diamond, industry spur, building or other specific track in its relative location, plus a tick-box to check off once it had been included:
STEP 2 - PLAN 1.0
Following on from my earlier schematics and adding signature scenes, this was my first draft of a comprehensive trackplan for Portage. For each railway, I included two mainlines, a switching lead, spurs and three triangle-shaped 'fissible points'.  The latter are: West Tower, Manitoba Pool 'B' elevator and the CN-CP interchange.  These three points become important to include if the plan undergoes fission (splits) into CN or CP. 

Also to be included in all track plans are 1980's-era east-to-west points for CN or CP:
CN: 
-2 or 3-track yard
-ramp track within yard
-bulk fuel dealer track
-team track opposite station
-United Grain Growers elevator

CP:
-McCallister Pea & Seed (or McCain frozen foods)
-team track
-North American Can of Canada warehouse and engine track opposite station
-Engro fertilizer shed
-Manitoba Pool 'A'
-Campbell's Soup west of Eighth Street
STEP 3 - PLAN 2.0
Each railway has one mainline at east and west ends, with the second mainline ending at East Tower or diverging at West Tower: CN's to the VIA connecting track or CP's to the Carberry Sub respectively. CP has a storage track for freight or Service cars, while CN's storage track is combined with the UGG spur it was adjacent to. 

Although I needed crossovers for switching purposes, I included as few as possible.  Some switching at the west end will require mainline crossover moves between tracks.  CP's trip to Campbell's will be facing-point switched instead of the prototype's trailing-point. I considered flipping CN's team track north of the lead, but kept it in its prototype location. There's something cool about running a complete freight train around one car in its way! I combined CP's team track with its nearby industry using a switchback.  The northernmost yard tracks will function as switching leads for each railway.
STEP 4 - PLAN 3.0
Remember how I wanted to maintain the length and proportion of Portage? I settled on a 24x3 foot layout, then tried to include all the above trackage and signature scenes. I wanted to avoid a log-pile (linear version of a spaghetti-bowl layout). It looks do-able on paper, but I needed to test-fire it.  I used the untried and unlikely DBS (Driveway Bed Sheets) method.  I spread old bedsheets that we ust as painting dropcloths on our driveway to create a 24x3 foot layout planning space.  
I brought up a six-inch bundle of flextrack, a box of turnouts, a box of snaptrack and structures from my railway room to represent three grain elevators, two stations, the fuel dealer and Campbell's Soup.  In less than an hour I had a finished trackplan mockup.  It became apparent that to save space, CP's McCallister, North American Can and possibly Campbell's , and CN's UGG elevator and fuel dealer could be represented by structure flats.  Another alternative would be to 'bend' trackwork around structures to make room for the trackage.  Overall, I was pleased that this trackplan would actually fit - in about 2,000 HO scale linear feet. The views from West tower (above) and East Tower (below) show the DBS method:
Detail views follow, looking from south to north. West Tower includes Campbell's Soup, the VIA connecting track from CP to CN, the start of the spurs, storage tracks and switching leads and MPE 'A':
The mid-section spreads out to include MPE 'B' (top) and UGG (bottom) elevators, both stations, CN's team track, fuel dealer and ramp:
The next-eastern section includes yard trackage and the interchange (centre):
And at East Tower, CP's team track and McCallister are at top while the mainlines rejoin and diverge:
In all trackplans, the cross-streets are shown as thicker lines, with trackage being the thinner lines with signature scenes labelled.
STEP 5 - PLAN 3.1
While 24x3 feet was a reasonable size layout for this prototype, I wanted a non-linear shape (L-shape) that could occupy a smaller, 12-foot square room, with additional staging potential, or for inclusion in an O-shaped layout. I bent Plan 3.0 90 degrees, with the 'hinge' area between Third ST and Tupper St. This bend would affect radius for passenger train operation, as well as the CN team track. If continuous operation is desired, the mainlines can be creatively bent at the east and west layout ends.
STEP 6 - PLAN 3.2
I'd always intended to split the layout into CN and CP halves. Although a long 24x2 foot layout could be planned for CN or CP, it seemed to me that more modellers would find a shorter 12x3 foot trackplan more useful. Plan 3.2 is CN-only, with all three fissible zones at layout's edge. All industries are still included, the yard is stub-ended with an optional crossover added. Two road crossings are included for orientation purposes, and the Tupper Street overpass could be added.  Mainlines can lead to staging, or this can be a fun-to-run switching layout!
STEP 7 - PLAN 3.3
Plan 3.3 is CP-only, also measuring 12x3 feet. The storage track and team tracks could still be added if desired. As with CN, Plan 3.3 could have staging added or remain a stand-alone layout.
These plans can be further refined, redrawn, revised or otherwise enhanced as desired. Though Portage does not have an over-abundance of lineside structures seen in more urban settings, motor car sheds, houses, the arena, water tower and various sheds and garages could be modelled as structures, flats or photo backdrops.

I've seen lots of photos of layouts using the Rix Highway overpass, which is used as a view block to separate scenes. Portage actually had Tupper Street's overpass that could be modelled as a great trainwatching spot, though I had to omit it from the smallest layout plans. Gravel roads and a plethora of trackside details would enhance the layout as well. On September 20, 1985 CN 5088-5055 lead a 40-foot grain boxcars and an 86-foot hicube boxcar in a westbound freight also at the UGG/storage track switch at sunset. In the next post, we'll look at operations and structures to bring these trackplans to life.

Running extra...

Another Portage-prototype modeller is Randy O'Brien of Niagara Falls, ON. Randy added to my early west-end schematic and has produced his own design sketch, mockup, trackplansome impressive benchwork and some impressive recent updates. Randy also shares some of his elevator construction here. John Longhurst recently travelled west through Portage on VIA train No 1. Manny Jacob snapped his train from the Tupper Street overpass, and his photos show how the Portage sightlines have improved with the eradication of almost all trackside structures.

I really shouldn't be surprised by the interest in Portage la Prairie modelling, but I am. Portage is definitely a Canadian hotspot worthy of 'fanning and modelling.  Be sure to check out my 'Railfanning and Modelling Portage la Prairie' posts in the right sidebar. Though I wallow in 1980's nostalgia, rest assured that heavy tonnage still rolls.

I just finished listening to Escape from Camp 14 by Blaine Harden. The harrowing tale of the life and subsequent escape from one of the few North Koreans born in a detention camp, Shin Donghyuk. The story helps us understand the mindset of the Kim dynasty, bizarre though it may be, as well as the incredibly strong will to live that we all possess.

11 comments:

  1. Oh, shoot! Now that you've given an excellent track plan, I have no excuse left to keep me from continuing my layout! ;)

    ReplyDelete
  2. Wow, what an excellent exercise! Certainly puts your past articles on Portage la Prairie into a new perspective. Makes one want to crank up the time machine and head back to the 80's. Thanks for sharing.

    ReplyDelete
  3. Hi Steve and train50,

    Thanks for your kind comments and support for my 1980's (update-able) Portage layout.

    If this inspired one modeller to model this worthy Canadian prototype, it'll all be worth it!

    Eric

    ReplyDelete
  4. Eric. This is a great plan. I spent many a day railfanning this town and I was never skunked. Super blog entry. Thanks

    ReplyDelete
  5. Thanks for your kind comments, and your memories of Portage, Chris. Maybe you'd share some photos on LVN sometime?

    I had fun doing the trackplans, because it brought back more good memories. I tried to provide a wide range of plans for various spaces.

    A brief stop in Brockville today was excellent timing...CSL Assiniboine in ballast upbound past the waterfront park near the railway tunnel.

    Eric

    ReplyDelete

  6. Dear Eric, I ve seen many track templates but bedsheets, if tired of mental stress of cramming track, just roll up in a sheet and snooze. Imagine the CP Canadian with 1406 and a RS 3 as a trail. I-Spy updates...Jun 01 Via 1 at Port Jct-6428-6427 with 20 cars Banff Pk. Jun 02 Via 693 at Diamond-6434-6442 with 5 cars. Jun 03 VIA no 1 at Diamond 6420-6407-6406 with 19 cars-Tremblant Pk. Jun 03 VIA 694 at Diamond...6445-64l7 with 5 cars. Saw Hydro #3 at VLS and plenty of CN trains at Port Jct on Sat and Diamond on Sun and Mon. Not much to update with until Fri with pix of TRF-ST Paul-Milw-GrBayand TRF. CP 2200 at TRF-Thief River Falls Minn is the first subdivision south of Emerson--Can/USA line. TRF has CP and 2 shortlines, Northern Plains and Minn Northern. Warren Minn and Crookston on the BN is great plus Grand Forks. The Portage planning exercise is like Keeping Up With the Gagnons. From the Peg...

    ReplyDelete
  7. Thanks for your comments and updates, Brian. The planning continues...next post on operations, interchange and industry possibillities.

    Eric

    ReplyDelete
  8. Great breakdown on the process Eric! It makes it easier to understand the paper layout when a person puts it loosely together in 'real time'!

    ReplyDelete
  9. Good to hear, Jason.

    I'm the worst one for thinking about, or putting something, on paper and realizing "this will never work" when it's too late. There's nothing like trying it for real, though I never connected a single joiner nor hooked up power to the track lying on my driveway!
    Eric

    ReplyDelete
  10. Eric this is awesome! I have seriously considered modeling Portage as one of the main scenes on my layout. I am in the planning stages right now as to what I want to include on my layout. My biggest question for you is what does the track layout look like now and what structures are left there. I want to model Portage a little later say.... early 2000's?. It is such a unique rail fanning spot. I have never been but hope to some day. I am interested in both CN/CP modeling so this town would fit in very well.



    Anton

    ReplyDelete
  11. Great to hear from you, Anton. You are certainly on the right 'track' for modelling Portage as your prototype. Two suggestions:
    1. secure lots of space
    2. check out the Railfanning and Modelling Portage la Prairie post list in my right sidebar. There you'll find three Portage Then and Now posts by three photographers, showing the current view of Portage. In my hermetically-sealed pre-1986 memories of Portage, there are still lots of industries, elevators and trackage, but regrettably that is no longer the case. The big industries are located on the periphery of town, not more centrally as before.

    Regardless, good luck and hope this helps. Update us when we have another confirmed Portage layout here in the blogosphere!
    Eric

    ReplyDelete

Comment and contribute! First name, please!